Managing client expectations during market fluctuations

30 Jul 2025 4 min read No comments valuation
Featured image

Market cycles are inevitable across residential property and commercial real estate. For RICS (Royal Institution of Chartered Surveyors) professionals, the aim is to give accurate advice and shape expectations so clients make timely, defensible decisions. This article sets out a practical approach—useful to homeowners and asset owners—rooted in surveyor‑grade methodology, clear communication, and disciplined risk management.

Understanding Client Concerns

Identifying Emotional Triggers

Clients rarely react to data alone; they respond to perceived risk:

  • Anchoring to peak prices (e.g., 2021–2022 sales) or last year’s real estate appraisal and investment appraisal.
  • Loss aversion for sellers and fear of overpaying for buyers.
  • Programme anxiety in construction project management where materials and labour costs move, and mortgage‑rate deadlines add pressure.

Surveyor’s response: Reframe around utility (space, specification, lifecycle cost) and total cost of ownership. Use quantity surveying input to translate market shifts into budget and cash‑flow impacts.

Clear Communication of Market Conditions

Move from headlines to particulars:

  • For a homeowner: present a micro‑market view—recent comparables, absorption rates, typical time‑to‑exchange.
  • For investors: show asset management metrics—vacancy, ERV vs passing rent, capex pipeline, debt‑service coverage.
  • For developers: combine feasibility studies with construction inflation indices and procurement lead times relevant to the scheme.

Tools: GIS‑enabled geospatial analysis, local building surveying intelligence from site inspections, and planning pipeline checks for supply dynamics in the catchment (urban planning, planning and development).

Aligning Client Goals with Market Realities

Translate ambitions into measurable constraints:

  • Price vs programme vs specification: you can optimise two; the third is a variable.
  • Tolerance bands: define acceptable ranges—e.g., “Proceed if bids land within ±3% of the cost plan; otherwise redesign.”
  • Decision gates: set go/no‑go points tied to planning, funding, and tender outcomes, managed through project management governance.

Effective Communication Strategies

Regular Updates and Transparency

Cadence beats ad hoc calls:

  • Traffic‑light briefings: monthly one‑pager across value, cost, risk, and programme.
  • Data room discipline: keep comparables, surveys, topographical surveys, contracts, and minutes current—crucial to lender and buyer confidence.
  • Assumptions register: document what underpins your advice (yield, build cost/m², void periods). When markets move, you can explain changes without eroding trust.

Managing Disappointment Constructively

When offers are below expectations or costs rise:

  • Bridge to options: scope reduction, alternative procurement, or timing.
  • Quantify trade‑offs: with a quantity surveyor, show the saving from design changes (spec swaps, standardisation) versus the value effect (buyer perception, rent).
  • Deploy soft landings: in occupation phases, align facility management and estate management practices to reduce operational surprises—particularly after value‑engineered builds.

Setting Realistic Timelines and Outcomes

  • Programme realism: build float for planning risk, utilities connections, and materials lead times; integrate infrastructure assessment and statutory approvals.
  • Milestone clarity: tie dates to dependencies (e.g., “Exchange within 10 working days of receiving the mortgage offer” or “Start on site 4 weeks after discharge of pre‑commencement conditions”).
  • Exit strategies: for sellers, pre‑agree price‑reduction triggers if the marketing period extends; for developers, identify a pause/redesign pivot if tenders breach the cost plan by more than 5%.

Strategic Advice in Volatile Markets

Risk Management Recommendations

  • Hedge what you can: fix critical path packages, consider currency hedges if importing, and lock in utilities diversion quotes early.
  • Scenario planning: model Base/Downside/Severe cases across value, rent, cost, and time; set contingency (typically 5–10% for simple refurbishments; higher for complex infrastructure projects).
  • Title and boundary certainty: avoid late‑stage shocks with early land surveying and boundary determination to prevent boundary disputes stalling the programme.

Property Investment Guidance

  • Income resilience over headline yield: favour tenant covenant strength, WAULT, and location liquidity over marginally higher yields in thin markets.
  • Capex discipline: link asset management initiatives (refurbishment, ESG upgrades) to measurable rental uplifts; validate with real estate consultancy comparables.
  • Planning‑led value: in brownfield land development, secure outline consent or pre‑app feedback before committing to land; align with heritage conservation and environmental assessment constraints.

Long‑term vs Short‑term Approaches

  • Homeowners: if moving is discretionary, optimise for quality of life rather than timing the market; consider retrofit packages (insulation, MEP) that enhance future value.
  • Developers: in downcycles, bank planning, discharge conditions, and refine design (architectural design) so you’re shovel‑ready when pricing stabilises.
  • Landlords: prioritise tenant retention via targeted capex (amenities, energy efficiency) that reduces operational cost and void risk; thread changes through leases via proper contract administration.

Practical frameworks you can use today

  • Expectation Charter (one page): purpose, price band, programme band, and must‑have features. All decisions refer back to this.
  • Decision Gate Checklist:
    • Planning position and pre‑commencement conditions (legal compliance)
    • Updated cost plan (quantity surveying) and procurement route
    • Lender/buyer feedback and valuation alignment (real estate appraisal)
    • Residual risk log (title, services, party walls) with owners and dates
  • Communication Rhythm: weekly email bulletins during marketing/tender; monthly board pack for complex projects; short call before each gate.

What success looks like

  • Fewer aborted transactions and reduced gazundering because assumptions are explicit.
  • Tenders inside tolerance because specs and risks are transparent to the market.
  • Clients who feel in control—even when prices or costs move—because decisions are pre‑framed and evidence‑led.

Bottom line: Managing expectations is not about optimism; it’s about clarity. When RICS standards, robust measurement (building surveying, site inspection), and disciplined communication meet, clients can navigate volatility with confidence—protecting budgets, programmes, and long‑term asset value. If you’d like, I can adapt these frameworks to your specific property—residential or commercial—and provide a tailored brief for agents, contractors, and lenders.

Lanre
Author: Lanre